JIRA - Calculated Date Field with Override

by Garth Leavey on November 22, 2017

As most clients are getting more advanced with their requirements we are having fun with solving some interesting problems.

These solutions appear very simple in essence but if you stack a few of them on top of each other you will have some incredible automations.

In this scenario we are asked to copy the greater of two date fields (adding 2 days) and also provide the ability to override manually.  We are using a checkbox (called Manual Override) with the value of 'Yes' to trigger a manual override.

%CODE1%

 

Topics: SIL Script, JIRA, Power Scripts, Atlassian Solutions